Georgia Ports Authority

Equipment & Labor


V. EQUIPMENT AND LABOR A. Rules

Printer-Friendly View

RULE:  34-580
ISSUED:  December 01, 2009 EFFECTIVE:  January 01, 2010
SUBJECT:  BILLING OF STAND-BY TIME ON CRANES
Stand-by time at the applicable stand-by rate will be billed to the party leasing the crane (cranes) from the time the crane is (cranes) (are) ordered until the time the crane is (cranes) (are) utilized, should the crane (cranes) not be utilized at the starting time ordered. Should the crane (cranes) be ordered and not utilized during any eight (8) hour period, and not modified as outlined in Rule 34-565, a minimum of four (4) hours call time as outlined in these rules and regulations shall be assessed for straight time orders, and a minimum of seven (7) or eight (8) hours call time, as outlined in Rule 34-570, shall be assessed for overtime or legal holiday orders.

Stand-by time charged will be billed against the crane operator and the mechanic at straight time, time and one-half, or double time rates on a per hour basis only, with no provisions made for fractional part of the hour. Should stand-by time be incurred during the same hour in which the crane (cranes) are utilized, the crane (cranes) time will be billed at the applicable crane lease rates.
 

Return

V. EQUIPMENT AND LABOR B. Charges

SUBJECTRULE #
EQUIPMENT LEASING RATES 34-625
SHIP TO SHORE CONTAINER CRANE HANDLING SURCHARGE 34-626
LABOR RATES - Savannah / Brunswick 34-630
LABOR RATES - BAINBRIDGE 34-635