V. EQUIPMENT AND LABOR A. Rules
Printer-Friendly View

RULE:  34-580
ISSUED:  October 15, 1998 EFFECTIVE:  November 01, 1998
SUBJECT:  BILLING OF STAND-BY TIME ON CRANES
Stand-by time at the applicable stand-by rate will be billed to the party leasing the crane (cranes) from the time the crane (cranes) are ordered until the time the crane (cranes) are utilized, should the crane (cranes) not be utilized at the starting time ordered. Should the crane (cranes) be ordered and not utilized during any eight (8) hour period, and not modified as outlined in rule 34-565, a minimum of four (4) hours call time as outlined in these rules and regulations shall be assessed for straight time orders, and a minimum of seven (7) or eight (8) hours call time, as outlined in rule 34-570, shall be assessed for overtime or legal holiday orders.

Stand-by time charged will be billed against the operator and the mechanic at straight time, time and one-half, or double time rates on a per hour basis only, with no provisions made for fractional part of the hour. Should stand-by time be incurred during the same hour in which the crane (cranes) are utilized, the crane (cranes) time will be billed at the applicable crane lease rates.


Return
V. EQUIPMENT AND LABOR B. Charges
SUBJECTRULE #
EQUIPMENT LEASING RATES (Notes 1, 2, 3,4,5) (I) 34-625
LABOR RATES - SAVANNAH / BRUNSWICK (I) 34-630
LABOR RATES - BAINBRIDGE (I) 34-635
Georgia Ports Authority - Redefining the Pace of Trade

Site Map | Privacy Statement | Terms & Conditions

Copyright 2007 by Georgia Ports Authority