The Authority will accept a container from or release a container to the inland carrier upon instructions from the steamship line or its authorized agent.
All physical handling of containers and chassis after receipt to the "point of rest" shall be accomplished by the Authority or its designated contractor, or as authorized by the Authority.
The Authority reserves the right to designate an area as the point of rest.
Loaded export containers arriving within ten (10) consecutive days of the scheduled arrival date of the vessel upon which they are booked will be allowed entrance into the Authority's marine terminals. The scheduled vessel arrival date shall be considered the first day of this allowable ten-day window. All other loaded export containers will be denied entrance.