1. CB 4, 5 & 6 Storm Drainage
Project ID: 0907-0366C   Bid Type: Construction   Status: Contract Pending
Posted: 2/11/2010   Project Bid Date: 7/19/2010

This project consists of the construction of a storm drainage treatment system on Container Berths 4, 5 and 6 at the Garden City Terminal.

More »
2. GCT Sewer System Improvements
Project ID: 0907-0370   Bid Type: Construction   Status: Upcoming Projects
Posted: 2/25/2010   Project Bid Date: TBD

The project consists of the construction of two (2) lift stations and associated sewer system on the Garden City Terminal.  The work includes the installation of the lift stations and a force main to connect to existing sewer line. 

More »
3. Mega Site Rail Access
Project ID: 0911-0378   Bid Type: Construction   Status: Upcoming Projects
Posted: 4/22/2010   Project Bid Date: Bid Documents Available 3rd Qtr CY2010; Bid Opening 3rd Qtr CY2010

The project consists of the design of approximately 9,000 feet of rail track that extends from the Georgia Central Railroad mainline into the Mega Site property to the area near the Mitsubishi plant (currently under construction, and will consist of four separate contracts to include 1.) Clearing & Grubbing, 2.) Civil Sitework, 3.) Access Track Work and 4.) Access bridge over Savannah-Ogeechee Canal. 

More »
4. Berth 18 Fender System Upgrade
Project ID: 0912-0380   Bid Type: Construction   Status: Contract Pending
Posted: 4/22/2010   Project Bid Date: 6/8/2010

Project consists of the demolition and replacement of an existing 760-foot-long fender system with steel piles and timber chocks, wharf deck demolition to facilitate the installation of four (4) new deck beams and bollards, replacement of wharf curbing, demolition and replacement of armoring for a 120-foot-long expansion joint, replacement of wharf deck drain covers and recoating of wharf bollards.

More »
5. Crane Simulator
Project ID: 1006-0415   Bid Type: Construction   Status: Upcoming Projects
Posted: 6/30/2010   Project Bid Date: TBD

Project consists of design customization of a Kone RTG and Kone STS crane simulator.  Work includes the design, manufacturer commissioning and training of the simulator.  Request for Proposal will be based on best value.

More »
6. Container Berth Realignment CB-4,5,6 Phase 3
Project ID: 1006-0414   Bid Type: Construction   Status: Upcoming Projects
Posted: 6/30/2010   Project Bid Date: Bid documents available early September 2010; Bid opening early October 2010

Summary Forthcoming.

More »
7. CI Northside Elevated Water Tank Rehabilitation
Project ID: 1002-0388   Bid Type: Construction   Status: Upcoming Projects
Posted: 7/22/2010   Project Bid Date: Bid documents available 4th Quarter CY2010; Bid Opening 4th Quarter CY2010

The project consists of recoating the interior and exterior of the 150,000 gallon elevated water tank at the Colonel's Island Terminal, the tank's supporting steel structure and the tank's masonry pump house.  The work includes structural repairs to improve tank access for maintenance such as replacing the tank's internal ladder, access hatch and catwalk decking and replace vents.  The tank will also require a new bird screen.

More »
8. CB1 to CB3 Wheeled Reefer Facilities Electrical Distriburtion Sytem
Project ID: 1005-0397   Bid Type: Construction   Status: Upcoming Projects
Posted: 7/22/2010   Project Bid Date: Bid Documents Available 07/28/10; Bid Opening 8/10/10

This project consists of the installation of the electrical distribution system to provide power to approximately 220 wheeled reefer slots within Container Berth 3 at the Garden City Terminal.  The work includes furnishing and installing feeder center panels, pulling wires and installing owner-furnished gang-box assemblies.

More »
« First  |  Page: 1  Last » 
 
Basic Requirements
for Bidders:

Specific project insurance requirements are determined on an individual project basis. However, all contractors performing work on the GPA’s property must comply with the GPA’s basic insurance requirements.

  • General Liability: $1,000,000 Limit (per occurrence)
  • General Auto: $1,000,000 Limit (per occurrence)
  • Workers’ Compensation: Proof of Coverage

All projects of $40,000 or more require Payment and Performance Bonds.

Georgia Ports Authority - Redefining the Pace of Trade

Site Map | Privacy Statement | Terms & Conditions | Login

Copyright 2009 by Georgia Ports Authority