Search
Projects
Projects
CB1 to CB3 Wheeled Reefer Facilities Electrical Distribution Sytem
Project ID: 1005-0397
Posted: 7/22/2010
Project Bid Date: 8/10/2010
Project Type: Construction
Status: Contract Pending

Summary

This project consists of the installation of the electrical distribution system to provide power to approximately 220 wheeled reefer slots within Container Berth 3 at the Garden City Terminal.  The work includes furnishing and installing feeder center panels, pulling wires and installing owner-furnished gang-box assemblies.

Details: detail wheeled reefer electrical.pdf    (277 KB)     More Downloads

More info:


Contact
Project Manager: Send Emailjamie Gwaltney, P.E.
Address: Moffatt & Nichol
2 East Bryan Street, Suite 501
Savannah, GA 31401
Telephone: 912.231.0044
FAX: 912.231.0046

Downloads
1. detail wheeled reefer electrical.pdf    (277 KB)
Bid Details Document
Posted: 8/3/2010 1:00 AM
Date modified: 8/3/2010 12:41 PM
Type: Adobe Acrobat Document (.pdf)
 
Basic Requirements
for Bidders:

Specific project insurance requirements are determined on an individual project basis. However, all contractors performing work on the GPA’s property must comply with the GPA’s basic insurance requirements.

  • General Liability: $1,000,000 Limit (per occurrence)
  • General Auto: $1,000,000 Limit (per occurrence)
  • Workers’ Compensation: Proof of Coverage

All projects of $40,000 or more require Payment and Performance Bonds.

Georgia Ports Authority - Redefining the Pace of Trade

Site Map | Privacy Statement | Terms & Conditions | Login

Copyright 2009 by Georgia Ports Authority