Search
Projects
Projects
CB 4, 5 & 6 Storm Drainage
Project ID: 0907-0366C
Posted: 2/11/2010
Project Bid Date: 7/19/2010
Project Type: Construction
Status: Archived

Summary

This project consists of the construction of a storm drainage treatment system on Container Berths 4, 5 and 6 at the Garden City Terminal.

Details: Document not available         More Downloads

More info:


Contact
Project Manager: Send EmailTed McIntyre
Address: CH2M HILL, Inc.
1000 Town Center Blvd.
Building 800, Suite 806
Savannah, GA 31322
Telephone: 912.330.3000
FAX: 912.330.9025

Downloads
No attachments available
 
Basic Requirements
for Bidders:

Specific project insurance requirements are determined on an individual project basis. However, all contractors performing work on the GPA’s property must comply with the GPA’s basic insurance requirements.

  • General Liability: $1,000,000 Limit (per occurrence)
  • General Auto: $1,000,000 Limit (per occurrence)
  • Workers’ Compensation: Proof of Coverage

All projects of $40,000 or more require Payment and Performance Bonds.

Georgia Ports Authority - Redefining the Pace of Trade

Site Map | Privacy Statement | Terms & Conditions | Login

Copyright 2009 by Georgia Ports Authority