Search
Projects
Projects
Berth Deeping Mitigation
Project ID: 1002-0390
Posted: 2/4/2010
Project Bid Date: 3/11/2010
Project Type: Construction
Status: Archived

Summary

The project consists of the installation of a 200 HP air compressor, associated supply piping and metal building enclosure at the Container Berth 9,Garden City Terminal. 

Details: detail berth mitigation.pdf    (429 KB)     More Downloads

More info:


Contact
Project Manager: Send EmailTed McIntyre
Address: CH2M HILL, Inc.
1000 Town Center Blvd.
Building 800, Suite 806
Savannah, GA 31322
Telephone: 912.330.3000
FAX: 912.330.9025

Downloads
1. detail berth mitigation.pdf    (429 KB)
Bid Details Document
Posted: 2/17/2010 1:00 AM
Date modified: 2/17/2010 4:29 PM
Type: Adobe Acrobat Document (.pdf)
 
Basic Requirements
for Bidders:

Specific project insurance requirements are determined on an individual project basis. However, all contractors performing work on the GPA’s property must comply with the GPA’s basic insurance requirements.

  • General Liability: $1,000,000 Limit (per occurrence)
  • General Auto: $1,000,000 Limit (per occurrence)
  • Workers’ Compensation: Proof of Coverage

All projects of $40,000 or more require Payment and Performance Bonds.

Georgia Ports Authority - Redefining the Pace of Trade

Site Map | Privacy Statement | Terms & Conditions | Login

Copyright 2009 by Georgia Ports Authority