Search
Projects
Projects
Equipment Emission Control Phase 1 & 2
Project ID: 0911-0375
Posted: 11/5/2009
Project Bid Date: 5/24/2010
Project Type: Equipment
Status: Archived

Summary

This project consists of the supply and installation of filters on rubber tired ganry cranes, toplifts and empty container handlers, large folklifts (36K# - 55K#) and yard hustlers.  Filters are Diesel Oxidation Catalysts (DOC) Filtration System with Closed Crankcase Ventilation (CCV) Systems.  Work includes provide all labor, materials, equipment, and services for Vendor to design, detail, fabricate, deliver, install, and test the equipment emission filters on the specified Owner equipment at the Georgia Ports Authority's Garden City Terminal located in Savannah, Georgia.

Details: Document not available         More Downloads

More info:


Contact
Project Manager: Send EmailMike Bray
Address: Georgia Ports Authority
Purchasing Office
P. O. Box 2406
Savannah, GA 31402
Telephone: 912.964.3991
FAX: 912.966.3611

Downloads
No attachments available
 
Basic Requirements
for Bidders:

Specific project insurance requirements are determined on an individual project basis. However, all contractors performing work on the GPA’s property must comply with the GPA’s basic insurance requirements.

  • General Liability: $1,000,000 Limit (per occurrence)
  • General Auto: $1,000,000 Limit (per occurrence)
  • Workers’ Compensation: Proof of Coverage

All projects of $40,000 or more require Payment and Performance Bonds.

Georgia Ports Authority - Redefining the Pace of Trade

Site Map | Privacy Statement | Terms & Conditions | Login

Copyright 2009 by Georgia Ports Authority