Search
Projects
Projects
GCT Sewer System Improvements
Project ID: 0907-0370
Posted: 3/1/2010
Project Bid Date: 3/10/2011
Project Type: Construction
Status: Archived

Summary

The project consists of the construction of two (2) lift stations and associated sewer system on the Garden City Terminal.  The work includes the installation of the lift stations and a force main to connect to existing sewer line. 

Details: details gct sewer improvements.pdf    (498 KB)     More Downloads

More info:


Contact
Project Manager: Send EmailTed McIntyre
Address: CH2M HILL, Inc.
1000 Town Center Blvd.
Building 800, Suite 806
Savannah, GA 31322
Telephone: 912.330.3000
FAX: 912.330.9025

Downloads
1. details gct sewer improvements.pdf    (498 KB)
Bid Details Document
Posted: 2/9/2011 1:00 AM
Date modified: 2/9/2011 3:53 PM
Type: Adobe Acrobat Document (.pdf)
 
Basic Requirements
for Bidders:

Specific project insurance requirements are determined on an individual project basis. However, all contractors performing work on the GPA’s property must comply with the GPA’s basic insurance requirements.

  • General Liability: $1,000,000 Limit (per occurrence)
  • General Auto: $1,000,000 Limit (per occurrence)
  • Workers’ Compensation: Proof of Coverage

All projects of $40,000 or more require Payment and Performance Bonds.

Georgia Ports Authority - Redefining the Pace of Trade

Site Map | Privacy Statement | Terms & Conditions | Login

Copyright 2009 by Georgia Ports Authority