Search
Projects
Projects
Container Berths 4,5 & 6 Upgrade/Overlay Phase 2
Project ID: 0907-0366
Posted: 6/12/2009
Project Bid Date: 1/12/2010
Project Type: Construction
Status: Archived

Summary

The project consists of pavement rehabilitation to approximately 23.5 acres of the container yard at the Garden City Terminal Container Berths 4, 5 & 6.  The work includes new paving, high mast lighting, drainage improvements, fire protection improvements, and support electrical equipment.  This project is partially funded by Federal Stimulus Funds.

Details: r1.pdf    (57 KB)     More Downloads

More info:


Contact
Project Manager: Send EmailTed McIntyre
Address: CH2M HILL, Inc.
1000 Town Center Blvd.
Building 800, Suite 806
Savannah, GA 31322
Telephone: 912.330.3000
FAX: 912.330.9025

Downloads
1. r1.pdf    (57 KB)
Bid Details Document
Posted: 1/7/2010 1:00 AM
Date modified: 1/7/2010 10:32 AM
Type: Adobe Acrobat Document (.pdf)
 
Basic Requirements
for Bidders:

Specific project insurance requirements are determined on an individual project basis. However, all contractors performing work on the GPA’s property must comply with the GPA’s basic insurance requirements.

  • General Liability: $1,000,000 Limit (per occurrence)
  • General Auto: $1,000,000 Limit (per occurrence)
  • Workers’ Compensation: Proof of Coverage

All projects of $40,000 or more require Payment and Performance Bonds.

Georgia Ports Authority - Redefining the Pace of Trade

Site Map | Privacy Statement | Terms & Conditions | Login

Copyright 2009 by Georgia Ports Authority