Mason ICTF Extension - Track Work
Project ID: 0810-0323B
Posted: 6/23/2011
Project Bid Date: 12/14/2011
Project Type: Construction
Status: Archived

Summary

Project consists of the installation of 6,000 LF of new rail spur tracks and eight (8) turnouts including ballast on the prepared subgrades.  The turnout required at the intersection with the Norfolk Southern Foundation Lead Track will be installed by Norfolk Southern.  Site work on the project will be performed by a separate contractor including the construction of the rail track subgrades and subballast.  The project is located at the Garden City Terminal, Garden City, Georgia.

Details: Document not available         More Downloads

More info:


Contact
Project Manager: Send EmailHoward Pigott
Address: CH2M HILL, Inc.
1000 Town Center Blvd.
Building 800, Suite 806
Savannah, GA 31322
Telephone: 912.330.3000
FAX: 912.330.9025

Downloads
No attachments available
 
Basic Requirements
for Bidders:

Specific project insurance requirements are determined on an individual project basis. However, all contractors performing work on the GPA’s property must comply with the GPA’s basic insurance requirements.

  • General Liability: $1,000,000 Limit (per occurrence)
  • General Auto: $1,000,000 Limit (per occurrence)
  • Workers’ Compensation: Proof of Coverage

All projects of $40,000 or more require Payment and Performance Bonds.